Skuld fast-track on track

Skuld fast-track on track

20 January 2012 - This week, two of the three subsea templates for Statoil's Skuld fast-track development were shipped out of Aker Solutions' yard in Egersund, Norway.

The two identical templates are being delivered on budget and on time.

The two identical templates are being delivered on budget and on time, in line with Statoil's standardization objectives to reduce cost levels as well as risk and time in execution of the project. The third and final template is scheduled for delivery in the second quarter.

The two templates are destined for the Fossekall field, which together with the Dompap field make up the Skuld development. Skuld is located north of the Norne field, approximately 200 kilometres west of Sandessjøen, Norway, in 360 metres water depth.

Copyright statement

All contents of this Site including without limitation the design, layout, graphics, photos, format, and other visual elements of the Site are protected by intellectual property rights, including but not limited to Copyright © 2012 Aker Solutions ASA (or where so indicated, any affiliates of Aker Solutions ASA or its licensors). Any rights not expressly granted herein are reserved. All ownership rights pertaining to the information and material contained on this Site, including but not limited to the Aker Solutions name, logos, trademark, graphics, photos, images, and content, are owned or have been duly licensed by Aker Solutions ASA (or any of its affiliates), WITH ALL RIGHTS RESERVED.