Aker Solutions' MH BOP handling system is designed to suit customer requirements/rig limitations and is tailor-made to any specification and built from one or more standard products.
BOP handling equipment
- MH BOP handling system
- MH BOP transporter
- MH overhead crane
- MH gantry crane
- MH BOP guide system
- MH base plate trolley
For further information - see attachment.
“
The MH BOP handling system is designed to suit the customer's requirements and the rig limitations
”
Upon receipt of information we can give a system proposal and suggest additions that can be made to give the most efficient handling system.
Systems can be delivered with capacities up to 400 mT (440 tons). The prime function of the BOP/subsea tree handling systems is to safely transport/lift/guide the equipment from the parked/storage position to the well centre, or vice versa.