Brent D

The Brent field has been developed with four fixed platforms where Brent B and D were constructed by Norwegian Contractors, now Aker Solutions. Brent D was installed in 1976.

Description

Concrete gravity with hexagon shape caisson, 3 shafts extends from the cells. Drilling production, accommodation and storage.

Construction site

Vats, Norway

Installation site

The Brent field, the North Sea, British sector

Topside, operating weight

22 433 tonnes

Total weight of structure

207 107 tonnes

Total height of concrete structure

165 m

Total height of platform with deck

299 m

Concrete

65 000 m3

Topside production capacity

150 000 bopd

Storage capacity

1 100 000 bbls

Well slots

48

Tow to field / installation on field

July 1976

Copyright statement

All contents of this Site including without limitation the design, layout, graphics, photos, format, and other visual elements of the Site are protected by intellectual property rights, including but not limited to Copyright © 2012 Aker Solutions ASA (or where so indicated, any affiliates of Aker Solutions ASA or its licensors). Any rights not expressly granted herein are reserved. All ownership rights pertaining to the information and material contained on this Site, including but not limited to the Aker Solutions name, logos, trademark, graphics, photos, images, and content, are owned or have been duly licensed by Aker Solutions ASA (or any of its affiliates), WITH ALL RIGHTS RESERVED.