Aker Solutions has constructed and installed two concrete gravity based platforms for the Sakhalin II project. As the project advance into its second phase, all-year drilling and oil and gas production in ice conditions is facilitated by the Lun-A and PA-B platforms.
The two concrete platforms were constructed in Russia in 14 months which was according to scedhule. The project included more than 600 Russian vendors and more than 90% russian labour and materials. The project had 3.6 million manhours without LTI.
Aker Solutions scope of work:
- Management and engineering
- Construction site design and development in Vostochny Port
- Construction of two concrete gravity structures
- Mechanical outfitting of the concrete structures
- Marine operations for the structures; towing and installation
| |
LUN-A
|
PA-B
|
|
Construction site
|
Vostochny Port near Vladivostok, East Russia.
|
|
Installation site
|
Offshore the Sakhalin island.
|
|
Topside weight
|
30 740 tonnes
|
38 100 tonnes
|
|
Water depth
|
48,2 m
|
30,0 m
|
|
CGBS size
|
105 m / 88 m / 72 m
|
94 m / 92 m / 54 m
|
|
Concrete
|
36 500 m3
|
29 000 m3
|
|
Reinforcement
|
15 700 tonnes
|
14 200 tonnes
|
|
Post-tensioning cables
|
1 060 tonnes
|
940 tonnes
|
|
Structural steel
|
3 118 tonnes
|
2 898 tonnes
|
|
Mechanical outfitting
|
2 936 tonnes
|
2 720 tonnes
|
|
Tow-out from dry dock
|
June 2005
|
July 2005
|
|
Installation on field
|
June 2005
|