Statfjord B

Statfjord B started production 3 years after Statfjord A, in 1982. The Statfjord B platform supplies Kårstø with oil and gas. The concrete structure is 175m high, has 4 shafts and 24 cells and providing facilities for drilling, production, oil storage and accomodation.

Description

Condeep 4 / 24. Drilling, production, storage and accommodation.

Construction site

Stavanger, Norway

Installation site

The Statfjord field, the North Sea

Topside, operating weight

50 100 tonnes

Total weight of structure

816 000 tonnes

Total height of concrete structure

175 m

Total height of platform with deck

271 m

Concrete

135 000 m3

Topside production capacity

250 000 bopd and 6 500 million m3/d gas

Storage capacity

1 900 000 bbl

Well slots

42

Topside installation on substructure

March 1981

Tow and installation

August 1981

Copyright statement

All contents of this Site including without limitation the design, layout, graphics, photos, format, and other visual elements of the Site are protected by intellectual property rights, including but not limited to Copyright © 2012 Aker Solutions ASA (or where so indicated, any affiliates of Aker Solutions ASA or its licensors). Any rights not expressly granted herein are reserved. All ownership rights pertaining to the information and material contained on this Site, including but not limited to the Aker Solutions name, logos, trademark, graphics, photos, images, and content, are owned or have been duly licensed by Aker Solutions ASA (or any of its affiliates), WITH ALL RIGHTS RESERVED.